SCE Charge Ready Home Panel Upgrades in Ventura and Santa Barbara Counties

If your panel is under 200 amps and your household qualifies, SCE’s Charge Ready Home rebate pays up to $4,200 toward a new 200 amp panel and a 240 volt circuit for EV charging, depending on how you qualify. We are an in network Charge Ready Home contractor, so the rebate is paid straight to us and taken off your invoice.

California C10 license #889112. Tesla certified installer. Lifetime guarantee on craftsmanship.

New 200 amp main panel installed under the SCE Charge Ready Home program in Camarillo

What the rebate pays for

The rebate covers the electrical work that gets your home ready for a Level 2 charger. It does not pay for the charger itself. Income qualified homes get up to 100% of the cost covered, and disadvantaged community homes up to 50%, to the limits below. SCE decides your amount.

Your home today What we install Income qualified Disadvantaged community
Panel under 200 amps New 200 amp panel and a 240 volt EV circuit Up to $4,200 Up to $2,100
Panel 200 amps or more 240 volt EV outlet within 25 feet of your parking Up to $1,000 Up to $500

Program terms checked at evhome.sce.com and in SCE’s program terms on November 21, 2026. SCE decides who qualifies and the final rebate amount, and terms can change. If your job costs more than the rebate, you pay the difference. The rebate is credited on your invoice, but it depends on SCE paying it: if SCE denies or reduces it, you owe that amount. City or county permit fees are billed at cost, plus our $450 permit handling fee. For typical prices, see our panel upgrade page and EV charger page.

Who qualifies

You need to be an SCE residential customer in a single family home with its own panel and meter. Detached and attached homes count, and so do mobile and manufactured homes with their own SCE meter and service. Then you qualify one of two ways:

  • Income qualified, up to 100% of cost. Your household earns less than 80% of the area median income, or someone in your home is enrolled in a public assistance program on SCE’s list. Up to $4,200 for a panel upgrade, or $1,000 for an outlet only.
  • Disadvantaged community, up to 50% of cost. Your home is in a disadvantaged community on the state’s map. Up to $2,100 for a panel upgrade, or $500 for an outlet only.

You don’t need to own an EV yet, but a Level 2 charger has to be installed within 180 days of the panel upgrade. Renters need the owner’s written approval, signed on SCE’s EV Charger Attestation Form, before work starts. Check your eligibility at evhome.sce.com.

Tesla Wall Connector on a dedicated 240 volt circuit in a Camarillo garage

Your part, our part

You apply. We handle Edison, the permit and the paperwork.

Your part

  • Apply at evhome.sce.com and upload your own income or ID documents. We never see them.
  • Send us your Prequalification ID.
  • Clear the area around your panel for install day.
  • Buy your charger, or have us supply it.

Our part

  • Claim your Prequalification ID, which extends it by 90 days.
  • File SCE’s meter spot application for the new service.
  • Pull the permit, worded so the rebate pays.
  • Install the panel and the 240 volt circuit, usually in one day.
  • Meet the inspector and get the final signed.
  • Photograph the panel, meter and main breaker before and after, the EV outlet or charger, and the outlet within 25 feet of your parking.
  • Send the program the finaled permit, an itemized invoice and the photos.

How it works

  1. Get prequalified

    Apply at evhome.sce.com. When you’re approved, you get a Prequalification ID. It’s good for 180 days.

  2. Send photos

    Send a photo of your panel with the door open, your meter, and where you park. You get a fixed written price before any work starts.

  3. Edison and the permit

    We claim your ID, file the meter spot with SCE, and pull the permit. SCE’s meter spot approval usually takes 1 to 3 weeks, sometimes longer.

  4. Install day

    The power is off for most of the day and back on the same day. We install the panel and the 240 volt circuit and test everything before we leave.

  5. Inspection and rebate

    The city or county inspects and signs the final. We send the program the claim, and the rebate is paid to us and credited on your invoice.

If Edison approves your home for less than 200 amps, we stop before the permit is filed. A 125 amp panel won’t qualify, so we’ll tell you what it takes to get to 200 amps before you spend anything.

Why Charge Ready claims get denied

Most denied claims come down to paperwork, not the wiring. The program pays only when the permit, the invoice and the photos all say the same thing.

  • The permit wording. It has to name your old amperage, the new 200 amp panel, the 240 volt circuit and Level 2 EV charging. “200 amp panel upgrade” alone gets rejected.
  • The final signature. The inspector has to sign the final box on the permit card, not just the electrical line.
  • The invoice. Every eligible cost has to be on its own line, and the charger is listed separately.
  • The photos. Before and after shots have to show the panel, the meter and the main breaker. The program also needs a photo of the EV outlet or charger, showing it’s within 25 feet of your parking.

We write the permit and the invoice that way from day one. That’s why we pull the permit ourselves on every Charge Ready job.

If SCE denies or reduces a rebate, you pay the difference. Our job is to make sure it never comes to that.

SCE Charge Ready questions

How do I know if I qualify?

Apply at evhome.sce.com. SCE’s program administrator reviews your household and tells you if you’re prequalified and for how much. We can’t check that for you, because the application and your documents go to them directly.

How much will I pay?

Most of our Charge Ready jobs run $5,000 to $8,000 before the rebate. A panel upgrade starts around $4,200, and the EV circuit adds $850 to $1,200. After the rebate, most customers pay a few thousand dollars. Income qualified homes can get up to $4,200 off and disadvantaged community homes up to $2,100. The rebate is credited on your invoice, but if SCE denies or reduces it, you owe that amount. You get a fixed written price before any work starts. Permit fees are billed at cost, plus our $450 permit handling fee.

Does the rebate pay for the charger?

No. It covers the panel and the 240 volt circuit. We install Tesla Wall Connector, ChargePoint, Emporia, Grizzl-E and other Level 2 chargers, and we can supply one or install yours. See our EV charger page.

What if Edison approves less than 200 amps?

It happens, usually when Edison’s line to the house can’t carry 200 amps. A 125 amp panel won’t qualify, so we hold the job and ask Edison what it takes to get to 200 amps.

On overhead service, Edison upgrades the line from the pole at no charge. On underground service, the trench, conduit and wire from Edison’s box to your house are your cost. Edison’s design for the new service usually takes several weeks.

We can price the trenching, but it’s often cheaper to hire a trencher yourself. Either way, we lay the conduit and pull the new wire, and you see the numbers before you decide.

Can I pull the permit myself?

On Charge Ready jobs we pull it. The permit wording decides whether the rebate pays, and the claims we’ve seen denied almost all started with the permit.

My Prequalification ID is about to expire. What now?

It lasts 180 days. When an in network contractor claims it, it’s extended 90 days. Send it to us early so the clock is on your side.

Can I use a contractor who isn’t in the program’s network?

You can, but you pay the contractor first, file the claim yourself, and wait for the rebate to be paid to you.

Do you do Charge Ready for apartments or businesses?

Charge Ready Home is for single family homes, including mobile and manufactured homes, with their own panel and meter. Homes that share a main panel don’t qualify. For multifamily or commercial EV charging, call us and we’ll talk through it.

Where do you work?

Ventura County and Santa Barbara County: Ventura, Oxnard, Camarillo, Port Hueneme, El Rio, Santa Paula, Fillmore, Somis, Ojai, Oak View, Mira Monte, Thousand Oaks, Newbury Park, Westlake Village, Moorpark, Simi Valley, Oak Park, Santa Rosa Valley, Santa Barbara, Goleta, Montecito, Summerland and Carpinteria.

Call (805) 650-9054, Monday to Friday, 8 am to 4 pm, or send us photos for a price. California C10 license #889112. Lifetime guarantee on craftsmanship.

Start your Charge Ready job

Send a photo of your panel with the door open, your meter, and where you park, plus your Prequalification ID if you have one. We’ll send back a fixed written price.