Generator Installation in Ventura County
Most whole home standby generators we install fall in the $21,000 to $26,500 range, and essential load systems in the $13,000 to $17,500 range. A standby generator turns on by itself within seconds of an outage and runs for days on natural gas. We size it with a real load calculation, pull the permit and meet the inspector.
California C10 license #889112. 22 years in business. Generac and Kohler.

Which backup power fits your home
Portable generator hookup
A weatherproof inlet outside, a generator breaker and a listed interlock in your panel. You roll out the generator, plug in one cord and flip the interlock. Most installs take half a day.
Essential load standby
A 10 to 22 kW standby generator with a 100 amp automatic transfer switch. We move the circuits you choose (fridge, lights, internet, furnace fan, well pump, medical equipment) onto the switch. Power comes back on its own.
Whole home standby
A 22 to 26 kW standby generator, or larger, with a 200 or 400 amp transfer switch. Load management turns big loads like the AC, range or dryer off and on automatically, so the whole house keeps working.
What a generator costs
These ranges come from the generator jobs we installed and quoted in 2024 to 2026.
| System | Typical price |
|---|---|
| Portable generator hookup, inlet and interlock (more on hookups) | Starting around $850 |
| Essential load standby, 10 to 22 kW, 100 amp transfer switch | $13,000 to $17,500 |
| Whole home standby, 22 to 26 kW, 200 or 400 amp switching | $21,000 to $26,500 |
| Large home, 48 kW, two 200 amp transfer switches | $48,000 to $55,000 |
| Commercial standby and temporary power | Quoted per project |
Updated November 2026. These are typical prices to help you plan, not a quote. Every home is different, and your price is set in a written quote after we see your home, in person or by photos. Standby prices include the generator, transfer switch, pad, wiring, start up and permit paperwork. Gas piping by a licensed plumber, trenching, and city or county permit and inspection fees (passed through at cost, plus our $350 fee for pulling and managing the permit) are extra. Long runs, a full panel, or an old panel that has to be replaced first raise the price. See what a standby generator costs for everything that moves the price.

Everything in a standby install
- The generator, set level on a precast pad
- An automatic transfer switch sized to your home
- Feeder and control wiring in conduit from the generator to the switch
- Your chosen circuits moved to the switch, and labeled
- Load management on big appliances when the generator needs it
- A load calculation, the permit application and the inspection
- Start up, a full transfer test, and a walkthrough so you know how it works
Sizing a generator the right way
We run a load calculation on every whole home bid, the same California Electrical Code method the city uses. If your home can draw more than the generator can carry, the code requires load management, and we write it into your price instead of finding out at inspection.
| What you want running | Typical size | Transfer switch |
|---|---|---|
| Essentials: lights, fridge, internet, furnace fan, well or medical equipment | 10 to 14 kW | 100 amp with circuits |
| Most of the home, big loads managed | 14 to 24 kW | 200 amp with load management |
| Whole home including AC, typical 200 amp service | 22 to 26 kW | 200 amp service rated |
| Large home or 400 amp service | 26 to 48 kW | Two 200 amp or one 400 amp |
Example: a 1,673 sq ft home calculated at 84 amps against a 14 kW generator that carries about 58. The transfer switch controls the AC and smart modules manage the range and dryer, so the system meets code and runs the whole house.
How a standby install works
-
Site visit and price
Within a week of your call we look at your panel, gas meter and where the generator can sit. You get the load calculation, the size we recommend and the circuits on backup, in writing.
-
Call your gas company
A generator can need more gas than your meter delivers. Before you sign, we give you the exact questions to ask SoCalGas so a meter upgrade never surprises you later.
-
Permit and equipment
We apply for the permit and order the generator the day you sign. Most units arrive in 1 to 6 weeks.
-
Install
2 to 4 working days for a whole home system, 1 to 2 for an essential load system. A licensed plumber runs and connects the gas line.
-
Start up and inspection
We start the generator once the gas line is tested, run a full transfer test, walk you through it and meet the inspector.
Old panel first
A generator is only as safe as the panel it connects to. If your panel is old or unsafe, we replace it first, and we never install a generator on a Zinsco or Federal Pacific panel. See panel upgrades.
Generators and solar
Solar and a generator can live on the same house, but they must never feed each other. We design the system so the solar is isolated whenever the generator runs. On homes with Tesla Powerwall or Franklin batteries, the generator is wired to work with the battery gateway.
Already have a portable home battery like Anker SOLIX, EcoFlow or Jackery? We connect those too. See portable hookups.
Commercial and HOA generators
We install, relocate and service generators for businesses, HOAs and construction sites, including crane set units, 400 amp and larger transfer switches, and trailer mounted temporary power while you wait on equipment. Commercial work is quoted per project.

Generator installation questions
What size generator do I need?
It depends on what you want running. We do a load calculation on your home. Most whole home jobs in Ventura County land between 22 and 26 kW with load management. Essentials only usually fit a 10 to 14 kW unit.
Can a generator run my whole house, including the AC?
Usually yes, with the right size or with load management that turns big loads off and on automatically so the generator is never overloaded.
Natural gas or propane?
Natural gas if you have it, because you never refuel. Propane works too, with a tank sized for how long you want to run. A licensed plumber sizes and runs the gas line, and we help you check with the gas company that your meter can supply the generator.
Will you install a generator I already bought, like one from Costco?
Yes. Tell us the make, model and size first. We check that it fits your home and your transfer switch. A used or customer supplied unit may need extra setup or start up work, which we bill by the hour and tell you about before we start.
Do I need a permit for a generator?
A standby generator needs a permit and an inspection. We prepare the load calculation, apply, and meet the inspector.
How loud is a standby generator?
An air cooled home standby unit is about as loud as a central AC unit while it runs, plus a short weekly exercise run. Sound enclosures are available.
Will a generator work with my solar?
Yes, when it is designed for it. The solar has to be isolated from the generator, and we design for it and price it up front.
How long does a generator install take?
A standby system takes 2 to 4 working days on site once the equipment is in and the permit is issued. A portable hookup takes about half a day.
Do you install on old Zinsco or Federal Pacific panels?
No. We replace those panels first.
Where do you work?
We work across Ventura County and southern Santa Barbara County, including Ventura, Oxnard, Camarillo, Port Hueneme, El Rio, Ojai, Oak View, Mira Monte, Santa Paula, Fillmore, Somis, Moorpark, Simi Valley, Santa Rosa Valley, Thousand Oaks, Newbury Park, Westlake Village, Oak Park, Carpinteria, Summerland, Montecito, Santa Barbara and Goleta.
Call (805) 650-9054, Monday to Friday, 8 am to 4 pm, or send us photos for an estimate. California C10 license #889112.
Send photos for a generator price
Email photos of your main panel with the door open, your gas meter, and the spot where the generator would go. Tell us your city and what you want running in an outage. We reply with a price range or a time for a site visit.